BUDGET GUIDE

This is a guide to give you a general idea of the cost of certain remodeling projects. Please note that these are only general examples and that the cost of any remodeling project can vary greatly depending on materials selected and the existing conditions of a home.

Whats included

 Space planning and layout design

 A dedicated project manager

 All labor & materials

 Dust control, floor protection, cleaning

Waste disposal

Whats not included 

Permit Fees

Smoke detector or electrical breaker upgrades (code requirement for most areas)

PRIMARY BATH

BASIC LEVEL

45k

  • Keep existing room footprint and fixture location

  • Porcelain/Ceramic tile floor, shower walls and shower floor

  • Acrylic drop-in tub with tile deck/surround

  • Single shower head

  • Frameless shower door

  • Vanity Cabinetry plumbing & light fixtures

  • Solid surface remnant vanity top

  • Change out existing switches & receptacles

MID LEVEL

52k

  • Everything in the Basic Level, Plus;

  • Modify layout of shower & tub

  • Shower head & handheld shower

  • Next level Vanity cabinetry, plumbing & Light Fixtures

  • Limited fixture movement 

UPPER LEVEL

60k

  • Everything in Mid Level; Plus

  • Modify room footprint for new layout in existing space

  • Expand shower space

  • Freestanding tub option

  • Natural Stone tile

  • Higher end cabinetry, plumbing & light fixtures 

  • Fixtures can be moved 

TYPICAL HALL BATH
5’ X 8’ REMODEL

BASIC LEVEL

20k

  • Keep existing room footprint & fixture locations

  • Keep existing tub

  • Porcelain/Ceramic tile floor & tub surround walls

  • Basic Vanity Cabinetry, Plumbing & Light fixtures 

  • Soild Surface Remnant vanity top

  • Change out existing switches & receptacles

  • Shower door not included

MID LEVEL

25k

  • Everything in the Basic Level, Plus

  • Next level Vanity cabinetry, plumbing & Light Fixtures

  • Frameless Shower door

UPPER LEVEL

30k

  • Everything in Mid Level, Plus;

  • Remove tub & replace with shower or new tub

  • Natural Stone tile

  • Higher end cabinetry, plumbing & light fixtures 

  • Fixtures can be moved 

POWDER BATH

BASIC LEVEL

10k

  • Keep existing room footprint & fixture locations

  • Existing flooring to remain

  • Basic Vanity Cabinetry, Plumbing & Light fixtures 

  • Soild Surface Remnant vanity top

  • Change out existing switches & receptacles

MID LEVEL

15k

  • Everything in the Basic Level, Plus;

  • Next level Vanity cabinetry, plumbing & Light Fixtures

  • Limited fixture movement (not affecting flooring)

UPPER LEVEL

20k

  • Everything in Mid Level, Plus;

  • Higher end cabinetry, plumbing & light fixtures 

  • New Flooring (hardwood or tile)

  • Fixtures can be moved

KITCHEN

BASIC LEVEL

Large Kitchen $65k+
Medium-Sized $55k+
Small Galley $30k+

  • Use existing cabinetry layout

  • Exisiting flooring to remain

  • Appliances remain in existing locations

  • Basic Cabinetry, Plumbing & Light fixtures 

  • Basic Soild Surface Countertops

  • Ceramic Tile Backsplash

MID LEVEL

Large Kitchen $75k+
Medium -sized $65k+
Small Galley $40k+

  • Everything in the Basic Level, Plus;

  • Cabinetry layout modifications allowed with existing space

  • New flooring 

  • Appliances may be moved to other locations

  • Next level Vanity cabinetry, plumbing & Light Fixtures

  • Next level Solid Surface Countertops 

UPPER LEVEL

Large Kitchen $95k+
Medium-sized $75k+
Small Galley $50k+

  • Everything in Mid Level, Plus;

  • Remove existing walls to accommodate expanded kitchen design layouts

  • New flooring in kitchen area & adjacent rooms

  • Higher end cabinetry, plumbing & light fixtures 

  • Natural stone countertops & backsplash 

Once your project cost has been established, we break it down into regular payments known as a Draw Schedule. This allows your remodeling investment to be spread out through the duration of your project rather than as larger payments made at the beginning or end. Changes to the scope of your project that affect the cost are handled through addendum's to your contract.